Pillars

Glossary

The words this tool uses, in plain English.

Loading…

It’s like a gate review — but honest

Great hardware isn’t stopped by a lack of engineering talent—it’s derailed by silent silos. When communication breaks down, design gates become guesses rather than certainties.

Pillars reads real build evidence, not self-report, to hand leadership a clear, defensible verdict on every gate: stop or pivot the bad ones at the €200 meeting, long before the €200k tooling order.

Gate Readiness

Systematically score your project across all key NPD dimensions for a gate readiness recommendation

Artifact Alignment

Get instant, automated gap analysis on core artifacts against hardware NPD standards

NPD Accelerator

Access best-in-class hardware NPD templates to standardize processes and accelerate execution

Tandem

Your sparring partner for talking through the NPD process, evidence in hand.

A sample report

Twenty seconds to see what you get

iterate

Stage detected from build evidence

DVT

Claimed stage and build evidence agree: dvt.

Close, but not yet. Fix what is missing and re-gate — the gaps are the kind you can close at this stage without changing direction.

Derived from the evidence — no model chose this

Why

  • People is one level below the DVT floor — closeable at this stage.
  • Gate evidence: 1 missing and 1 unverified of 3 checklist items.
01234MATURITYPEOPLE1level 1 of 2 needed · −1 below floorPROCESS2level 2 of 2 needed · within specCULTURE2level 2 of 2 needed · within specRESEARCH3level 3 — above the 2 this stage needs · within spec
level reachedbelow floorDVT floor
Sample data — not a real assessment